Every HCIC power unit is pressure-tested at 3000 PSI before it ships, and every unit leaves the works with a written test record. The pages below set out the management systems we are certified to, the inspection route a unit follows, and the tests it passes on the way out.

Certified Management Systems

Three certificates you can audit

HCIC runs its design and assembly activities under three certified management systems. The scans below are the certificates as issued, reproduced at full size so the registration numbers, scope and validity dates can be checked.

ISO 9001:2015 quality management system certificate issued to HCIC Group

ISO 9001:2015 — Quality Management System

Reg. 21724Q0545R0S — Hydraulic power units, hydraulic cylinder design and hydraulic power units assembly.

ISO 14001:2015 environmental management system certificate issued to HCIC Group

ISO 14001:2015 — Environmental Management System

Reg. 21724E02939R0S — Environmental management activities related to the design of hydraulic power units, hydraulic cylinders and assembly of hydraulic power units.

ISO 45001:2018 occupational health and safety management system certificate issued to HCIC Group

ISO 45001:2018 — Occupational Health & Safety Management System

Reg. 21724S02808R0S — Occupational health and safety management activities related to the design of hydraulic power units, hydraulic cylinders and assembly of hydraulic power units.

All three certificates were issued on 11 April 2024 and remain valid until 10 April 2027. They are issued to HCIC Group's registered manufacturing entity in Jinan, Shandong, China (unified social credit code 91370100MABR9YKC94) by Shandong LAJ International Certification Service Co., Ltd. with IAF and CNAS accreditation. The scans below are shown at full readable size.

Quality Control

From raw material to delivery: three controlled stages

No stage is outsourced. Material enters the works, is machined and welded in-house, and leaves only after a documented pressure test.

Incoming inspection

Strict material testing on incoming steel and components, including salt spray testing.

In-process inspection

Full-time inspectors at every production stage, not only at the end of the line.

Final testing

Hydraulic test bench checks pressure, leakage and durability on every unit.

HCIC test laboratory

HCIC test laboratory

Salt spray test chamber

Salt spray test chamber

Comprehensive quality assurance ensures reliability in every product we deliver.

Contamination Control

Clean parts, controlled seals, no residue

Hydraulic cylinders fail from contamination long before they fail from fatigue, so cleanliness is treated as a process, not a tidiness issue.

Oil cleaning

Every part is cleaned so that nothing contaminated reaches the assembly bench.

Constant-temperature seal storage

Seal batches are stored in a controlled-temperature room, which keeps elastomer properties stable and batches traceable.

Steam cleaning for cylinders

All cylinder parts go through cleaning before assembly.

Component cleaning station

Component cleaning station

Seal storage room

Seal storage room

Steam cleaning before assembly

Steam cleaning before assembly

Weld Verification

The three welds that carry the load are checked individually

Weld quality decides whether a cylinder survives a refuse cycle or a tipping cycle. Each of the three critical welds gets its own dedicated check.

Cylinder shaft welding check

Verified on a dedicated ultrasonic testing unit before the tube is closed.

Cylinder end cup welding check

The end cup joint is checked separately — it takes the full stroke load.

Piston rod welding check

The rod-to-cap weld is verified before chrome plating.

Cylinder shaft weld check

Cylinder shaft weld check

Cylinder end cup weld check

Cylinder end cup weld check

Piston rod weld check

Piston rod weld check

Test Programme

Life test, ultimate test and simulation test

Simulation proves the geometry on the screen, the rigs prove it on the floor, and the pressure test proves it before the unit is boxed.

Simulation test

Advanced software simulation for stress analysis and performance optimization before tooling.

Life test

Running rigs reproduce a full duty cycle so wear is measured, not assumed.

Ultimate test

Cylinders are loaded beyond nominal pressure to establish the real margin.

Simulation test for stress analysis

Simulation test for stress analysis

Life test rig

Life test rig

Hydraulic test bench

Hydraulic test bench

Ultimate load test rig

Ultimate load test rig

Traceability

Every order carries its own quality report

Traceability is built into the production data, not reconstructed afterwards from memory.

Real-time production tracking

Precise progress monitoring and shortened delivery cycles.

Full-process traceability

Unique QR codes ensure complete quality control from material to packed unit.

Detailed quality report

Every order comes with a Quality Report documenting all test data.

International standards

Cylinders are designed to ISO 6020, ISO 6022 and ISO 10100 mounting and dimension standards.

Transparent records

Quality records are available for customer review.

Real-time production tracking

Real-time production tracking

QR code traceability

QR code traceability

Per-order quality report

Per-order quality report

Delivery & Packaging

Packed for the sea, not for the shelf

Export packing is defined per product, with steel bands, stretch film, corner protection and a documented packing SOP. Palletised loads are staged and photographed before dispatch.

Documented packing SOP

Packing steps are recorded, so the same protection is applied to every order.

Palletised and staged

Loaded units are banded, wrapped and staged in the warehouse before dispatch.

Palletised goods in the dispatch warehouse

Palletised goods in the dispatch warehouse

Wrapped pallet load

Wrapped pallet load

Packing equipment service SOP

Packing equipment service SOP